Tag Archives: W10

Structure Fire – Box 1007

Oct 17th, 1738 hrs units responded for a structure fire in box 1007. Incoming units were informed by a Sheriff’s Office Deputy the fire was out. The fire was contained to the kitchen area, crews checked for extension and extinguished some hot spots. DFREM Battalion 1 held command for the incident. Co.10 units remained on scene for about 40 minutes ventilating and cleaning up. No one was displaced by the fire and Co.10 units cleared just after 1820 hrs.

Units Responded: W10,E10, W7, W1, E505, K1, R1, BNF 1

Structure Fire – Box 0305 – Horse Country Trail

Wednesday, August 21st, 2013 2100hrs: Units were alerted for the working structure fire at Horse Country Trail. Wagon, Tanker, and AC 10 responded with a total of 7 personnel from the Opal area after clearing a previous fire. Units on scene were advising of a large single family dwelling with heavy fire on side Delta of the structure and the fire was spreading to the roof. AC10 arrived on scene and was assigned Operations Officer by command. Wagon 10 arrived and sent its personnel to the fire ground while the tanker remained at the dump site. Wagon 10’s crew along with Engine 4 made entry on side Charlie and stopped the fire from spreading to the garage and kitchen. Company 10 units remained on scene until about 0200 helping in the salvage and overhaul process.

Units: W10, K10, AC10, E4, and other county units.

Structure Fire – Box 1008 – Lake Willow CT

Saturday, June 19, 2010 09:50hrs: Companies 10, 1, 7, and 504 were dispatched for a structure fire at Lake Willow Court. Initial reports was fire had started in the garage and now was spreading to the rest of the house. Further updates stated the fire was through the roof and was starting to catch a neighbor’s house on fire. E10 and W10 arrived on scene to find a two story single family dwelling with fire showing from the first and second floor the residence and began an aggressive defensive attack on the structure. A second alarm was sounded due to the exposures. W10s OIC established Lake Willow Court command. Fire had reached the Bravo 1 exposure and was going in through the attic. Crews from E10 and W10 began an exterior attack at the A/B corner of first structure to extinguish the fire and protect the other house. Crews from 1 and 7 were sent to the Bravo 1 exposure to extinguish the fire. With other crews arriving on the scene the fire were brought under control in about 30 minutes.

Units: E10, W10, K10, A10-1, E1, W1, K1, R1, E7, E504, E524, R504, E3, E4, E2.